Green menu price list
Application
Application
Application
You can check, change, or cancel the schedule for on-site construction work on your My Page.
Click here for instructions on how to check your My Page
The installation date for J:COM NET Hikari (N) cannot be changed on My Page. Please contact the customer center.
申请・咨询
신청·문의
Ứng dụng / Yêu cầu
आवेदन / सम्पर्क
电话咨询(有翻译)
전화 상담(통역 있음)
Tư vấn qua điện thoại (có phiên dịch)
फोनबाट परामर्श (दुभाषे सहित)
9:00-18:00 [Open all year round]
日本語での通話はこちら申请・咨询
신청·문의
Ứng dụng / Yêu cầu
आवेदन / सम्पर्क
电话咨询(有翻译)
전화 상담(통역 있음)
Tư vấn qua điện thoại (có phiên dịch)
फोनबाट परामर्श (दुभाषे सहित)
9:00-18:00 [Open all year round]
日本語での通話はこちら申请・咨询
신청·문의
Ứng dụng / Yêu cầu
आवेदन / सम्पर्क
电话咨询(有翻译)
전화 상담(통역 있음)
Tư vấn qua điện thoại (có phiên dịch)
फोनबाट परामर्श (दुभाषे सहित)
9:00-18:00 [Open all year round]
日本語での通話はこちら联系我们
문의
Hỏi đáp
सम्पर्क
电话咨询(有翻译)
전화 상담(통역 있음)
Tư vấn qua điện thoại (có phiên dịch)
फोनबाट परामर्श (दुभाषे सहित)
9:00-18:00 [Open all year round]
日本語での通話はこちら联系我们
문의
Hỏi đáp
सम्पर्क
电话咨询(有翻译)
전화 상담(통역 있음)
Tư vấn qua điện thoại (có phiên dịch)
फोनबाट परामर्श (दुभाषे सहित)
9:00-18:00 [Open all year round]
日本語での通話はこちら联系我们
문의
Hỏi đáp
सम्पर्क
电话咨询(有翻译)
전화 상담(통역 있음)
Tư vấn qua điện thoại (có phiên dịch)
फोनबाट परामर्श (दुभाषे सहित)
9:00-18:00 [Open all year round]
日本語での通話はこちらCorresponding area
You can enter in 6 areas nationwide.
Hokkaido Electric Power Area / Tohoku Electric Power Area /
TEPCO area/
Kansai Electric Power Area/
Chugoku Electric Power Area/Kyushu Electric Power Area
- Excluding some areas.
- Those who live outside the Hokkaido area and subscribed before April 3, 2024 will be subscribed to "J:COM DENRYOKU."
Information on price menus by region
We will display the price plan that matches the area where you live.
Equivalent to Hokkaido Electric Power's standard electricity rate plan with the Carbon F plan added, excluding fuel cost adjustments. *1
Typical price examples
Click here for details
J:COM Electricity Home Use Course Green Usage-Based B
(Equivalent to Hokkaido Electric Power's "metered electricity rate B with carbon F plan added")
A plan suitable for general households.
- For contracted amperes (10A to 60A), please check the usage details of your contracted electric power company.
| Basic charge | unit | 料金(税込) |
|---|---|---|
| 10 amps (A) | 1 contract | 418.00円 |
| 15 amps (A) | 627.00円 | |
| 20 amps (A) | 836.00円 | |
| 30 amps (A) | 1,254.00円 | |
| 40 amps (A) | 1,672.00円 | |
| 50 amps (A) | 2,090.00円 | |
| 60 amps (A) | 2,508.00円 | |
| Electricity charge | 料金(税込) | |
| 1st stage fee | Up to first 120kWh | (35.69 yen/kWh × amount of electricity used) |
| Second stage fee | Over 120kWh up to 280kWh | (41.98 yen/kWh × amount of electricity used) |
| 3rd stage fee | Over 280kWh | (45.70 yen/kWh × amount of electricity used) |
| Environmental value equivalent amount (Green-based pricing B only) |
unit | 料金(税込) |
| 1 kWh | 3.00円 | |
| Minimum monthly fee | 1 contract | 427.95円 |
- If you do not use electricity at all, the basic charge will be half price.
- If the sum of the basic charge, electricity charge, and fuel cost adjustment is less than the minimum monthly charge mentioned above, the charge for that month will be the sum of the minimum monthly charge mentioned above and the renewable energy generation promotion surcharge as defined in J:COM Electricity Household Course Contract Terms and Conditions.
J:COM Electricity Home Use Course Green Usage-Based C
(Equivalent to Hokkaido Electric Power's "metered electricity rate C with carbon F plan added")
A plan suitable for shops, offices, restaurants, etc. that use a lot of electricity.
| Basic charge | unit | 料金(税込) | |
|---|---|---|---|
| 1kVA | 418.00円 | ||
| Electricity charge | 料金(税込) | ||
| 1st stage fee | Up to first 120kWh | (35.69 yen/kWh × amount of electricity used) | |
| Second stage fee | Over 120kWh up to 280kWh | (41.98 yen/kWh × amount of electricity used) | |
| 3rd stage fee | Over 280kWh | (45.70 yen/kWh × amount of electricity used) | |
| Environmental value equivalent amount (Greens only, per-course C) |
unit | Fee (tax included) | |
| 1 kWh | 3.00円 | ||
- If you do not use electricity at all, the basic charge will be half price.
- This does not support the time-of-use rate plans offered by former general electric utilities.
Rates equivalent to the metered electricity plans of former general electric utilities, excluding fuel cost adjustments. *2
Typical price examples


Click here for details
J:COM Electricity Home Use Course a Green Usage-Based B
(Equivalent to Tohoku Electric Power's Metered Lighting B)
A plan suitable for general households.
- For contracted amperes (10A to 60A), please check the usage details of your contracted electric power company.
| Basic charge | unit | Fee (tax included) |
|---|---|---|
| 10 amps (A) | 1 contract | 369.60円 |
| 15 amps (A) | 554.40円 | |
| 20 amps (A) | 739.20円 | |
| 30 amps (A) | 1,108.80円 | |
| 40 amps (A) | 1,478.40円 | |
| 50 amps (A) | 1,848.00円 | |
| 60 amps (A) | 2,217.60円 | |
| Electricity charge | Fee (tax included) | |
| 1st stage fee | Up to first 120kWh | (29.62 yen/kWh × amount used) |
| Second stage fee | Over 120kWh up to 300kWh | (36.37 yen/kWh × amount used) |
| 3rd stage fee | Over 300kWh | (40.32 yen/kWh × amount used) |
| Minimum monthly fee | unit | Fee (tax included) |
| 1 contract | 358.95円 | |
- If you do not use electricity at all, the basic charge will be half price.
- If the sum of the calculated basic charge and electricity charge is less than the minimum monthly charge, that one month's charge will be calculated based on the above minimum monthly charge and the renewable energy power generation stipulated in the J:COM Denki Home Course Contract Terms and Conditions. This is the total promotion levy.
J:COM Electricity Home Use Course a Green Usage-Based C
(Equivalent to Tohoku Electric Power's "Meter-rate Lighting C")
A plan suitable for shops, offices, restaurants, etc. that use a lot of electricity.
| Basic charge | unit | Fee (tax included) |
|---|---|---|
| 1kVA | 369.60円 | |
| Electricity charge | Fee (tax included) | |
| 1st stage fee | Up to first 120kWh | (29.62 yen/kWh × amount used) |
| Second stage fee | Over 120kWh up to 300kWh | (36.37 yen/kWh × amount used) |
| 3rd stage fee | Over 300kWh | (40.32 yen/kWh × amount used) |
- If you do not use electricity at all, the basic charge will be half price.
We are not accepting new applications for the Green Menu's all-electric menu. Only those who are currently subscribed to the all-electric menu of J:COM DENRYOKU Home Course Basic Menu can subscribe by changing their plan. Click here for price list
Rates equivalent to the metered electricity plans of former general electric utilities, excluding fuel cost adjustments. *2
Typical price examples


Click here for details
J:COM Electricity Home Use Course a Green Usage-Based B
(Equivalent to TEPCO Energy Partner's "Meter-rate Lighting B")
A plan suitable for general households.
- For contracted amperes (10A to 60A), please check the usage details of your contracted electric power company.
| Basic charge | unit | Fee (tax included) |
|---|---|---|
| 10 amps (A) | 1 contract | 311.75円 |
| 15 amps (A) | 467.63円 | |
| 20 amps (A) | 623.50円 | |
| 30 amps (A) | 935.25円 | |
| 40 amps (A) | 1,247.00円 | |
| 50 amps (A) | 1,558.75円 | |
| 60 amps (A) | 1,870.50円 | |
| Electricity charge | Fee (tax included) | |
| 1st stage fee | Up to first 120kWh | (29.80 yen/kWh × amount used) |
| Second stage fee | Over 120kWh up to 300kWh | (36.40 yen/kWh × amount used) |
| 3rd stage fee | Over 300kWh | (40.49 yen/kWh × amount used) |
| Minimum monthly fee | unit | Fee (tax included) |
| 1 contract | 328.08円 | |
- If you do not use electricity at all, the basic charge will be half price.
- If the sum of the calculated basic charge and electricity charge is less than the minimum monthly charge, the charge for that month will be the sum of the minimum monthly charge and the renewable energy generation promotion surcharge stipulated in J:COM Electricity Household Course Contract Terms and Conditions.
J:COM Electricity Home Use Course a Green Usage-Based C
(Equivalent to TEPCO Energy Partner's "Meter-rate Lighting C")
A plan suitable for shops, offices, restaurants, etc. that use a lot of electricity.
| Basic charge | unit | Fee (tax included) |
|---|---|---|
| 1kVA | 311.75円 | |
| Electricity charge | Fee (tax included) | |
| 1st stage fee | Up to first 120kWh | (29.80 yen/kWh × amount used) |
| Second stage fee | Over 120kWh up to 300kWh | (36.40 yen/kWh × amount used) |
| 3rd stage fee | Over 300kWh | (40.49 yen/kWh × amount used) |
- If you do not use electricity at all, the basic charge will be half price.
We are not accepting new applications for the Green Menu's all-electric menu. Only those who are currently subscribed to the all-electric menu of J:COM DENRYOKU Home Course Basic Menu can subscribe by changing their plan. Click here for price list
Rates equivalent to the metered electricity plans of former general electric utilities, excluding fuel cost adjustments. *2
Typical price examples


J:COM Electricity Home Use Course a Green Metered A
(Equivalent to Kansai Electric Power's Metered Lighting A)
A plan suitable for general households.
| Minimum charge | unit | Fee (tax included) |
|---|---|---|
| Up to first 15kWh | 1 contract | 522.58円 |
| Electricity charge | Division | Fee (tax included) |
| 1st stage fee | Over 15kWh up to 120kWh | (20.21 yen/kWh × amount of usage) |
| Second stage fee | Over 120kWh up to 300kWh | (25.61 yen/kWh × amount used) |
| 3rd stage fee | Over 300kWh | (28.59 yen/kWh × amount used) |
- aThere is no basic charge for metered A.
J:COM Electricity Home Use Course a Green Usage-Based B
(Equivalent to Kansai Electric Power's Metered Lighting B)
A plan suitable for shops, offices, restaurants, etc. that use a lot of electricity.
| Basic charge | unit | Fee (tax included) |
|---|---|---|
| 1kVA | 447.21円 | |
| Electricity charge | Fee (tax included) | |
| 1st stage fee | Up to first 120kWh | (17.81 yen/kWh × amount used) |
| Second stage fee | Over 120kWh up to 300kWh | (21.02 yen/kWh × amount of usage) |
| 3rd stage fee | Over 300kWh | (23.52 yen/kWh × amount of usage) |
- If you do not use electricity at all, the basic charge will be half price.
We are not accepting new applications for the Green Menu's all-electric menu. Only those who are currently subscribed to the all-electric menu of J:COM DENRYOKU Home Course Basic Menu can subscribe by changing their plan. Click here for price list
Rates equivalent to the metered electricity plans of former general electric utilities, excluding fuel cost adjustments. *2
Typical price examples


Click here for details
J:COM Electricity Home Use Course a Green Metered A
(equivalent to Chugoku Electric Power's Metered Lighting A)
A plan suitable for general households.
| Minimum charge | unit | Fee (tax included) |
|---|---|---|
| Up to first 15kWh | 1 contract | 759.68円 |
| Electricity charge | Fee (tax included) | |
| 1st stage fee | Over 15kWh up to 120kWh | (32.75 yen/kWh × amount used) |
| Second stage fee | Over 120kWh up to 300kWh | (39.43 yen/kWh × amount used) |
| 3rd stage fee | Over 300kWh | (41.55 yen/kWh × amount of usage) |
- aThere is no basic charge for metered A.
J:COM Electricity Home Use Course a Green Usage-Based B
(Equivalent to Chugoku Electric Power's "Meter-rate Lighting B")
A plan suitable for shops, offices, restaurants, etc. that use a lot of electricity.
| Basic charge | unit | Fee (tax included) |
|---|---|---|
| 1kVA | 447.97円 | |
| Electricity charge | Fee (tax included) | |
| 1st stage fee | Up to first 120kWh | (30.06 yen/kWh × amount of usage) |
| Second stage fee | Over 120kWh up to 300kWh | (36.15 yen/kWh × amount used) |
| 3rd stage fee | Over 300kWh | (38.02 yen/kWh × amount used) |
- If you do not use electricity at all, the basic charge will be half price.
We are not accepting new applications for the Green Menu's all-electric menu. Only those who are currently subscribed to the all-electric menu of J:COM DENRYOKU Home Course Basic Menu can subscribe by changing their plan. Click here for price list
Rates equivalent to the metered electricity plans of former general electric utilities, excluding fuel cost adjustments. *2
Typical price examples


Click here for details
J:COM Electricity Home Use Course a Green Usage-Based B
(Equivalent to Kyushu Electric Power's Metered Lighting B)
A plan suitable for general households.
- For contracted amperes (10A to 60A), please check the usage details of your contracted electric power company.
| Basic charge | unit | Fee (tax included) |
|---|---|---|
| 10 amps (A) | 1 contract | 316.24円 |
| 15 amps (A) | 474.36円 | |
| 20 amps (A) | 632.48円 | |
| 30 amps (A) | 948.72円 | |
| 40 amps (A) | 1,264.96円 | |
| 50 amps (A) | 1,581.20円 | |
| 60 amps (A) | 1,897.44円 | |
| Electricity charge | Fee (tax included) | |
| 1st stage fee | Up to first 120kWh | (18.37 yen/kWh × amount used) |
| Second stage fee | Over 120kWh up to 300kWh | (23.97 yen/kWh x amount used) |
| 3rd stage fee | Over 300kWh | (26.97 yen/kWh × amount used) |
| Minimum monthly fee | unit | Fee (tax included) |
| 1 contract | 335.34円 | |
- If you do not use electricity at all, the basic charge will be half price.
- If the sum of the calculated basic charge and electricity charge is less than the minimum monthly charge, the charge for that month will be the sum of the minimum monthly charge and the renewable energy generation promotion surcharge stipulated in J:COM Electricity Household Course Contract Terms and Conditions.
J:COM Electricity Home Use Course a Green Usage-Based C
(Equivalent to Kyushu Electric Power's "Met Rate Lighting C")
A plan suitable for shops, offices, restaurants, etc. that use a lot of electricity.
| Basic charge | unit | Fee (tax included) |
|---|---|---|
| 1kVA | 316.24円 | |
| Electricity charge | Fee (tax included) | |
| 1st stage fee | Up to first 120kWh | (18.37 yen/kWh × amount used) |
| Second stage fee | Over 120kWh up to 300kWh | (23.97 yen/kWh x amount used) |
| 3rd stage fee | Over 300kWh | (26.97 yen/kWh × amount used) |
- If you do not use electricity at all, the basic charge will be half price.
We are not accepting new applications for the Green Menu's all-electric menu. Only those who are currently subscribed to the all-electric menu of J:COM DENRYOKU Home Course Basic Menu can subscribe by changing their plan. Click here for price list
Application
Application
Application
You can check, change, or cancel the schedule for on-site construction work on your My Page.
Click here for instructions on how to check your My Page
The installation date for J:COM NET Hikari (N) cannot be changed on My Page. Please contact the customer center.
申请・咨询
신청·문의
Ứng dụng / Yêu cầu
आवेदन / सम्पर्क
电话咨询(有翻译)
전화 상담(통역 있음)
Tư vấn qua điện thoại (có phiên dịch)
फोनबाट परामर्श (दुभाषे सहित)
9:00-18:00 [Open all year round]
日本語での通話はこちら申请・咨询
신청·문의
Ứng dụng / Yêu cầu
आवेदन / सम्पर्क
电话咨询(有翻译)
전화 상담(통역 있음)
Tư vấn qua điện thoại (có phiên dịch)
फोनबाट परामर्श (दुभाषे सहित)
9:00-18:00 [Open all year round]
日本語での通話はこちら申请・咨询
신청·문의
Ứng dụng / Yêu cầu
आवेदन / सम्पर्क
电话咨询(有翻译)
전화 상담(통역 있음)
Tư vấn qua điện thoại (có phiên dịch)
फोनबाट परामर्श (दुभाषे सहित)
9:00-18:00 [Open all year round]
日本語での通話はこちら联系我们
문의
Hỏi đáp
सम्पर्क
电话咨询(有翻译)
전화 상담(통역 있음)
Tư vấn qua điện thoại (có phiên dịch)
फोनबाट परामर्श (दुभाषे सहित)
9:00-18:00 [Open all year round]
日本語での通話はこちら联系我们
문의
Hỏi đáp
सम्पर्क
电话咨询(有翻译)
전화 상담(통역 있음)
Tư vấn qua điện thoại (có phiên dịch)
फोनबाट परामर्श (दुभाषे सहित)
9:00-18:00 [Open all year round]
日本語での通話はこちら联系我们
문의
Hỏi đáp
सम्पर्क
电话咨询(有翻译)
전화 상담(통역 있음)
Tư vấn qua điện thoại (có phiên dịch)
फोनबाट परामर्श (दुभाषे सहित)
9:00-18:00 [Open all year round]
日本語での通話はこちら-
※1
The fuel cost adjustment amount is calculated using the same formula as Hokkaido Electric Power's standard electricity contract. However, since there is no upper limit on the fuel cost adjustment amount, depending on how the fuel cost adjustment is applied, it may be more expensive than Hokkaido Electric Power's metered electricity plan. Hokkaido Electric Power's discount campaigns are not applicable.
-
※2
Unlike the former general electric utilities, there is no upper limit on fuel cost adjustments. Depending on changes in the fuel cost adjustment amount and future rate changes, it may become more expensive than the old general electric utility company. Discount campaigns and account transfer discounts from former general electric utilities are not applicable.
[About the amount including tax]
- The listed amounts include tax unless otherwise specified.
- Consumption tax differences may occur due to changes in the consumption tax rounding method under the invoice system.
- J:COM Top
- Our Service
- J:COM Denki
- Price menu
- green menu
- Price list
