Pay-as-you-go menu (Hokkaido Electric Power area)

J:COM DENRYOKU

J:COM電力に関するお問い合わせ

Contact us by phone (toll free)
0120-848-816
AM 9:00-PM 6:00 [open all year round]

Metered Menu (Hokkaido Electric Power Area) List

We would like to introduce you to the "Pay-As-You-Go Menu" offered in the J:COM DENRYOKU Home Course.
The "Pay-as-you-go menu" is a plan for general household customers, and the unit price is set in stages according to the amount of usage.

Metered menu list

Customers whose power contract type is equivalent to the following plans of "Hokkaido Electric Power" can apply.

Hokkaido Electric Power J:COM DENRYOKU Household Course
Metered light B Usage B
Metered light C Pay-as-you-go C
Close

Save money even in months when you use it too much and months when you don't use it much.

There are three levels of discounts available depending on electricity usage. The more electricity you use, the more you save.

Electricity charge (metered portion) discount illustration

  • Former general electric utility company
  • There is a maximum limit on the amount of fuel cost adjustment.
  • Calculated using the same formula as Hokkaido Electric Power Co. However, since there is no upper limit on the fuel cost adjustment amount, depending on fuel costs, it may be more expensive than Hokkaido Electric Power Co.
    • Depending on your contract plan, usage status, fluctuations in fuel cost adjustment amounts, various discounts, etc., the price may not be cheaper.

Price example

Price example (for a 4-person household, 50A)

Illustration of discounts on electricity bills when you switch to J:COM DENRYOKU

Customers who currently have a contract with Hokkaido Electric Power Company other than the metered electricity plan B or C cannot apply for the Basic Plan because it would increase their electricity bill. They can only apply for the Green Plan.

Preconditions and discount amount
  • The stated amount is for the meter reading in May 2024 and includes the basic charge.
  • A "fuel cost adjustment amount" and a "renewable energy generation promotion surcharge" are required separately.
  • [Prerequisites] Households that are subscribed to the Hokkaido Electric Power Plan listed above and live in the Sapporo area.
  • Average annual electricity bill: 25,527 yen (tax included)/month.
  • Based on the results of our survey conducted in January 2017, assuming an average monthly power consumption of 558 kWh for a four-person household. Actual amounts may differ.
  • This does not include discount campaigns offered by former general electric utilities, direct debit discounts, or discounts offered as part of the government's sudden change mitigation measures.
  • [About the discount amount] <Up to the first 120kWh> (Local electricity unit price x usage amount) x 0.5% discount, <Over 120kWh and up to 280kWh> (Local electricity unit price x usage amount) x 0.5% discount, <For more than 280kWh> Calculated as (local electricity unit price x usage amount) x 1% discount. Depending on the customer's contract plan, usage status, and changes in fuel cost adjustment amounts, it may not be cheaper.
Close

Price image (for a two-person household/30A)

Illustration of discounts on electricity bills when you switch to J:COM DENRYOKU

Customers who currently have a contract with Hokkaido Electric Power Company other than the metered electricity plan B or C cannot apply for the Basic Plan because it would increase their electricity bill. They can only apply for the Green Plan.

Preconditions and discount amount
  • The stated amount is for the meter reading in May 2024 and includes the basic charge.
  • A "fuel cost adjustment amount" and a "renewable energy generation promotion surcharge" are required separately.
  • [Prerequisites] Households that are subscribed to the Hokkaido Electric Power Plan listed above and live in the Sapporo area.
  • If the average annual electricity bill is 13,745 yen (tax included)/month.
  • Based on our survey results as of January 2017, the average monthly power consumption for a two-person household is 316kWh. The actual amount may differ.
  • This does not include discount campaigns offered by former general electric utilities, direct debit discounts, or discounts offered as part of the government's sudden change mitigation measures.
  • [About the discount amount] <Up to the first 120kWh> (Local electricity unit price x usage amount) x 0.5% discount, <Over 120kWh and up to 280kWh> (Local electricity unit price x usage amount) x 0.5% discount, <For more than 280kWh> Calculated as (local electricity unit price x usage amount) x 1% discount. Depending on the customer's contract plan, usage status, and changes in fuel cost adjustment amounts, it may not be cheaper.
Close

Mechanism of reliable power distribution while maintaining quality

(Figure) Power grid

Since we will use the same power transmission and distribution equipment (wires, substations, indoor wiring, etc.) of the old general electric utility as before, the quality and safety of electricity (possibility of power outages, etc.) will not change. Indoor construction * ・No presence required.

It may be necessary to replace the outdoor meter (watt-hour meter) (free of charge).

Electricity rate information (basic rate/power rate)

J:COM DENRYOKU Household Course Metered B
(Equivalent to Hokkaido Electric Power's "metered light B")

A plan suitable for general households. We will give you a discount on electricity charges depending on your usage.

Power procurement adjustment unit price unit From April 1, 2024
Until the day before the April meter reading date
Price (tax included)
From April 2024 meter reading date onwards
Price (tax included)
1 kWh 7.47 yen abolition
  • For contracted amperes (10A to 60A), please check the usage details of your contracted electric power company.
Basic charge unit From April 1, 2024
Until the day before the April meter reading date
Price (tax included)
From April 2024 meter reading date onwards
Price (tax included)
10 amps (A) 1 contract 374.00 yen 402.60 yen
15 amps (A) 561.00 yen 603.90 yen
20 amps (A) 748.00 yen 805.20 yen
30 amps (A) 1,122.00 yen 1,207.80 yen
40 amps (A) 1,496.00 yen 1,610.40 yen
50 amps (A) ¥1,870.00 2,013.00 yen
60 amps (A) 2,244.00 yen 2,415.60 yen
Electricity charge From April 1, 2024
Until the day before the April meter reading date
Price (tax included)
From April 2024 meter reading date onwards
Price (tax included)
1st stage fee Up to first 120kWh (35.44 yen/kWh x usage amount)
× 0.5% discount
(35.35 yen/kWh x usage amount)
× 0.5% discount
Second stage fee Over 120kWh up to 280kWh (41.73 yen/kWh x usage amount)
× 1% discount
(41.64 yen/kWh x usage amount)
× 0.5% discount
3rd stage fee Over 280kWh (45.45 yen/kWh x usage amount)
× 10% discount
(45.36 yen/kWh x usage amount)
× 1% discount
Minimum monthly fee unit From April 1, 2024
Until the day before the April meter reading date
Price (tax included)
From April 2024 meter reading date onwards
Price (tax included)
1 contract 403.70 yen 417.19 yen
  • If you do not use electricity at all, the basic charge will be half price.
  • This does not support the time-of-use rate plans offered by former general electric utilities.
  • If the sum of the calculated basic charge and electricity charge is less than the minimum monthly charge above, the charge for that month will be the minimum charge above and the renewable energy generation specified in the J:COM DENRYOKU Home Course Contract Terms and Conditions. This is the total promotion levy.
Close
J:COM DENRYOKU home use course Consumption C
(Equivalent to Hokkaido Electric Power's "metered light C")

This plan is suitable for stores, offices, restaurants, etc. that use a lot of electricity. We will give you a discount on your electricity bill depending on your usage.

Power procurement adjustment unit price unit From April 1, 2024
Until the day before the April meter reading date
Price (tax included)
From April 2024 meter reading date onwards
Price (tax included)
1 kWh 7.47 yen abolition
Basic charge unit From April 1, 2024
Until the day before the April meter reading date
Price (tax included)
From April 2024 meter reading date onwards
Price (tax included)
1kVA 374.00 yen 402.60 yen
Electricity charge From April 1, 2024
Until the day before the April meter reading date
Price (tax included)
From April 2024 meter reading date onwards
Price (tax included)
1st stage fee Up to first 120kWh (35.44 yen/kWh x usage amount)
× 0.5% discount
(35.35 yen/kWh x usage amount)
× 0.5% discount
Second stage fee Over 120kWh up to 280kWh (41.73 yen/kWh x usage amount)
× 1% discount
(41.64 yen/kWh x usage amount)
× 0.5% discount
3rd stage fee Over 280kWh (45.45 yen/kWh x usage amount)
× 10% discount
(45.36 yen/kWh x usage amount)
× 1% discount
  • If you do not use electricity at all, the basic charge will be half price.
  • This does not support the time-of-use rate plans offered by former general electric utilities.
Close

Application flow

Switching is very easy!

  • for the contract period
    no binding
  • Initial cost
    pear
  • Cancellation fee
    pear
  • Witness construction
    Pear *1

power statement
(meter reading slip, etc.)

Sign Up

Start using

You don't need to be present or cancel the contract with the electric power company.

It may take several weeks to switch.

If you are considering signing up or adding services

Sign Up information

Check how much your electricity bill will be

electric bill
simulation

J:COM電力に関するお問い合わせ

Contact us by phone (toll free)
0120-848-816
AM 9:00-PM 6:00 [open all year round]

Price menu for which new acceptance has ended

Click here for J:COM Electric Power All Electric Menu

[Notes]
  • If you are currently subscribed to another retail electricity provider, you will need to switch to J:COM DENRYOKU to sign a contract.

[Disclosure based on the Specified Commercial Transactions Act regarding "J:COM DENRYOKU Plan" (hereinafter, this Service)]

  • Even if you do not use electricity, the basic fee will still be charged.
  • For details on fees, etc., please refer to the ``Participation Contract Terms and Conditions Price List II''.
  • This service uses the power transmission and distribution lines of general power transmission and distribution companies, so in the event of unavoidable circumstances such as nearby power outages or other natural disasters, power outages will also occur.
  • J:COM DENRYOKU supply area is the area under the jurisdiction of Hokkaido Electric Power Company (excluding some remote islands, etc.).
  • Depending on your area of residence and current contract details, you may not be able to switch to or continue using this service.

【please note】

  • Service changes may incur a fee.
  • Regarding cooling-off: 1. If you notify us in writing or electromagnetic records by the day 8 days have passed from the date of receipt of the "Explanation of important matters regarding J:COM service subscription" that will be given to you at the time of contracting for this service. , the contract for providing this service can be canceled. We will notify you of the start date (switching date) of this service at a later date. 2.If this service has already been provided to the customer, the cost of canceling this service will be borne by our company.
  • If customers request this, we will send written or electronic data containing the full text of the display based on the Specified Commercial Transactions Law without delay.
Close

[About the amount including tax]

  • Consumption tax differences may occur due to changes in the consumption tax rounding method under the invoice system.